Al-Galala · Wastewater treatment
Al-Galala Konouz Treatment Plant
Al-Galala City, Zone 1 · 2021
- Capacity
- 500 m³/day
- Process
- Membrane bioreactor (MBR)
- Location
- Al-Galala City, Zone 1
- Client
- Military Authority
- Consultant
- Future Consultant
- Scope
- Design, supply, installation and testing
- Status
- Handed over April 2021
Overview
Design, supply, installation and testing of a 500 m³/day wastewater treatment plant in Al-Galala City using membrane bioreactor (MBR) technology.
The scope covered every station building and the perimeter wall, the plant's power and protection systems, and the MBR process equipment: metal works, air blowers and air piping, sludge screening, an integrated grit trap and air gates.
Civil works
- Electrical foundation works
- Sanitary works and rain drainage
- Interior restoration and insulation of the sump
- Interior and exterior finishing works
- Construction of all station buildings and the station wall
Electromechanical works
- 135 kVA standby generator
- Low- and medium-voltage electrical panels
- Earthing system and fire alarm
- Core plant systems: ventilation fans, jib cranes and firefighting
- MBR process systems: metal works, blowers and air piping, sludge screening, integrated grit trap and air gates